GUIDE SDD v1.18.0 · flow schematic

How work flows through GUIDE

Pick a configuration and watch one changelog item travel from the PM's request to a merged ship-SHA. Columns are stages, rows are who holds the work, and the pills under each stage are the gates that close it.

GUIDE stage and gate schematic for the selected configuration
Stage
Title

    Gate bank · run_all

    GatePre-foldPost-fold

    Fail-fast, in this order. Exit codes only, so the same bank runs locally and in CI, as .ps1 or .sh.

    Permutation matrix · route × host tier