Pick a configuration and watch one changelog item travel from the PM's request to a merged ship-SHA. Columns are stages, rows are who holds the work, and the pills under each stage are the gates that close it.
| Gate | Pre-fold | Post-fold |
|---|
Fail-fast, in this order. Exit codes only, so the same bank runs locally and in CI, as .ps1 or .sh.